Wight provided Phase III and Corridor Construction Management (CCM) services for the Tri-State Tollway and I-57 interchange projects including:

  1. I-294 Over IL-83 (147th Street) Roadway and Bridge Reconstruction and Widening, which involved the reconstruction and widening of the I-294 bridges carrying traffic over 147th Street.
  2. I-294 Rehabilitation and Resurfacing, from 95th Street to I-57, which involved 10.5 miles of pavement repair and resurfacing, bridge deck patching, and joint replacement of bridge structures.